Completed Utility Projects
Peterson Airforce Base Inspection Building Peyton, CO
Provided all site infrastructure for 10-acre inspection facility.
Schriever AFB Visitor Center Colorado Springs, CO
Provided all site infrastructure for a 3-acre visitor center.
Conestoga 72 Mesquite, NV
Installed 1,300lf of 72" RCP through existing golf course at depths exceeding 23'
4th and Abriendo Storm Sewer Interceptor Pueblo, CO
Installed 900lf of 30" RCP in existing streets, extensive utility crossings and traffic control
Appletree Sewer Re-alignment Fountain, CO
Installed 2,700lf of 8" sanitary sewer with 24 connections to existing services. Extensive bypass pumping and de-watering.
Windsor Highlands Windsor, CO
Provided overlot and rough grading for site development and clubhouse
Oak Creek Club Upper Marlboro, MD
Imported 70,000 CY material to construct clubhouse building pad and future parking lot
Anthem Mesquite Commercial Mesquite, NV
Imported and placed nearly 500,000 CY material to construct future 6.85-acre commercial / retail pads
Shore Fox Ranch Raw Water Delivery System Granby, CO
Installed 11,000 lf of 16” fusion welded HDPE. Performed extensive de-watering and rock excavation
Canyons South Castle Rock, CO
Installed 18,000 lf of 18”-42” RCP in private rural development
Monument Ridge Monument, CO
Commercial site development 230,000 CY overlot grading, sewer, water and storm sewer. 1965 LF of 8" sanitary sewer at depths to 23'. 3200 LF of 8" water main, 2400 LF of RCP from 42" to 18".
Pueblo West Sewer Extension Golden, CO
3200 lf 18" sanitary sewer with 2 bores under Hwy 50, extensive rock excavation under a tight schedule.
Ridge Drive Water Main Replacement Pueblo, CO
1400 lf 8" water main renewal, 30 service tie overs and extensive traffic control.
Schriever AFB Waterline Extension Colorado Springs, CO
5400 lf 4" waterline extension: Ran waterline between existing 8" force main and 6" high pressure gas.
Peterson AFB 48" Storm Extension Colorado Springs, CO
575 LF 48" storm sewer extension
NORAD Water Main Extension Colorado Springs, CO
Water main extension through tight easement at NORAD facility.
Hidden Creek Watermain Replacement Colorado Springs, CO
Replaced 3400 LF of 6" water main with new 12" line. New line ran 5' off existing line, which required keeping old line in service while completing new line. Maneuvered around several creek crossings.
Research Buildings Colorado Springs, CO
Commercial development: 1200 LF of 8" sanitary, 2100 LF of 8" water, & 900 LF 36" RCP.
Woodmen Heights Business Park Colorado Springs, CO
Commercial development: 2300 LF 24" DIP water transmission line, 1900 LF 30" sewer interceptor, & 1200 LF 66" RCP storm outfall.